Monday, August 26, 2019

Final exterior home photos on the day that we closed PLUS everything that has gone wrong so far

Here we are, 5 years later almost, and I'm just getting around to posting the images of our house when we actually got around to closing.

The pillars on the front porch were finally put in.

As well as our landscaping package (though it would be well over a year until we actually had decent grass growing)

All of the ground was leveled out and the retaining walls were installed.





Since we finished building, there has not been a ton of issues.  Mostly everything that we had problems with, Ryan Homes eventually came out to fix.  Some items took multiple phone calls, but ultimately they have handled everything that has come up.

The one issue that we had right away was a leak in our master bathroom.  At first, they didn't believe that there was an issue, but after a few calls, they sent someone out and we pretty much had to have our entire master shower taken out, re-tiled and re-grouted.  That fixed the issue and we haven't seen anything else since.

We also had a small leak in our attic which after 1 call was resolved.  They sent someone out immediately and got it fixed up.  This fixed the issue.

One other thing that we had to have them come out for was to fix the radon pipe that was running through the house.  Where they had placed it did not leave enough vertical pipe to install the radon fan in our house.  This happened after our warranty was up but they still sent people out to move the pipe and get it so be "proper" for the fan to be placed.  We were very thankful and happy that they were willing to help us out years after we had closed.

The one issue that we still have (and have had since right after moving in) is that water always seems to get onto our front porch when it rains.  It runs along the siding channels and down into the front porch corner.  They have come out many times now but can't seem to fix it.  We are just hoping that it doesn't cause issues later one.

All in all, we are very happy with how our home building experience went.  We love the house and so far it seems to be a pretty quality build.  The one piece of advice that I would offer to others going through the home-build process is to be diligent and go to the home site frequently to make sure you don't see anything "wrong" with what it going on.  And also take LOTS of pictures of everything.  Especially the framing.   We have referenced those photos so many times over the years to see where pipes or wires or duct work are running - also to see about where we might expect to find a stud in the walls when we are hanging things.

Thursday, November 13, 2014

We close in less than a week!!!

So we close in SIX days! I can't believe we are almost done with this process!! I'm also so excited to get into the new house finally!!  Everything is coming together and the end is in sight.

We went to the house last night and most of the interior finishes are just about done. It looks like a livable space with flooring and lights and carpeting and painted walls abd a hot water tank!!

The pictures don't even do justice to how beautiful it all is. Of course there are some minor things that we noticed such as bad patch jobs and some sub par finishing work, but our project manager has been amazing and I know he will take care of the last few things we have noticed... Maybe even before we bring them up at the pre settlement meeting on Monday.

Here are some photos of where things are... The cleaning people were in the house when we stopped by.

Friday, October 10, 2014

Slacking on my posts! So much progress!

The last month has been hectic to say the least. Not with building our new house, but with selling the old one. House was listed on a Thursday, we didn't accept any showing appts until Saturday, had three days of non stop showings, then subsequently received three different offers. We went through the multiple offer situation, negotiated one through then had to start the home inspection process. That ended last week and we agreed on the final terms early this week. Just finished the last of the demands and can focus our attention on the new house again finally!

We had our pre drywall meeting on September 29 and found out the pre settlement meeting would be November 17!! Found out this morning that our closing date will be November 19!! I am so excited to get in the new house!!

Over the last few weeks we have watched the electrical, plumbing and HVAC go in. Then over the last week they put in the insulation and began dry walling. I don't know why I am still so amazed by how fast it all gets done, but I am.

When we stopped at the house yesterday, they had started getting siding up and we have a garage door. I love the gray color that we went with. It looks so good with the white trim!

Our PM told us the drywalling process would take about two weeks, so I'm guessing it will be done by the end of next week. Then the trim starts to go in. So much progress! It is really looking like a house now!!

Wednesday, September 10, 2014

Framing seems to mostly be done

We are mostly under roof!! We normally stop out at the house 2 to 3 times a week and we just went yesterday, but it's all happening so fast that we couldn't resist stopping again today.

Yesterday the whole second floor was framed and most of the roof up.  Today we have almost all of our windows!!!!  Our garage concrete floor also got poured today.    It is incredible!! I love watching our house come together!!!

I am obsessed with taking pictures of everything...

Front view

Back view

Side view

Morning room

Great room with fire place framed

Garage with concrete floor

Welcome center

Dining room

Foyer

Entrance to master suite

Laundry room

Master bathroom

One of the master closets

Master bedroom windows

Second floor hall bath

Tuesday, September 2, 2014

First floor framing is done!!

We weren't sure if we should drive by the house today since we were just there on Saturday and yesterday was a holiday, but figured we would see if they started any framing... well!! The whole first floor is framed!! It is finally looking like a house and we are finally able to get a feel for how big the rooms will be in our own home!!
Our PM said last week that it might be totally framed out by the end of the week and I seriously had my doubts that was possible. Not anymore!! We might be under roof by Friday if this progress keeps up.
One negative though -- in one of my previous posts I talked about how one of our basement windows was put in the wrong place and needed to be moved to where we had selected -- this was handled immediately, so it was no big deal. When we stopped out on Saturday and the floor was laid down, our fireplace was overlapping the window. It was supposed to be between the fireplace and garage. We took a pic and emailed the PM and he said they saw that last week and the fix was already scheduled. So even though it's another 'wrong' thing (albeit a small one), it is already being taken care of.
So far, so good!!! Hopefully the next time I post, the entire house is framed!!! :-)
Exterior
Basement walkout from the outside
Exterior on the garage side
Morning room
Kitchen
Great room
Dining room
Front windows in the garage
Garage
Basement steps
Basement from the bottom of the steps and the first basement window
Basement walkout
Basement view of the other window